Always included
in the supply: EDIBON Real Time Control System Data
Acquisition
Board Software for:
- Data Acquisition
- Data Management
- Computer Control Computer
(not included
in the supply) Cables and Accessories Manuals
Process diagram and elements allocation:
DIODES
Module THYRISTORS
Module DIODES
Module FRONT PANEL CAPACITORS
Module OPEN CONTROL
+
MULTICONTROL
+
REAL TIME CONTROL POWER
Supply PRACTICES
SCHEMES SENSORS
Module
Exercises and practical possibilities:
1.- Single phase half-wave rectifier with load R. 2.- Single phase half-wave rectifier with load R-L. 3.- Single-phase half-wave rectifier with R-L load with free wheeling diode (FWD). 4.- Single-phase full-wave rectifier. 5.- Three-phase half-wave uncontrolled rectifier. 6.- Three-phase full-wave uncontrolled rectifier. 7.- Single-phase half-wave controlled rectifier. 8.- Single-phase full-wave controlled rectifier. 9.- Single-phase full-wave controlled rectifier with a DC motor. 10.- Three-phase full-wave completely controlled.
|
11.- Single-phase semi-controlled rectifier. 12.- Three-phase full-wave semi-controlled rectifier. 13.- Chopper. 14.- Single-phase square-wave inverter. 15.- Single-phase displaced-phase inverter. 16.- Single-phase inverter. PWM control. 17.- Three-phase inverter. PWM control with R load and R-L load. 18.- Three-phase inverter. PWM control with AC motor. 19.- Alternating regulators: R and R-L load. 20.- Asynchronous three-motor with rotor in short circuit (squirrel cage).
|
Possibilities of other available expansions:
Expansion 1: Expansion 2: Multipost EDIBON Mini Scada-Net System 1 UNIT =
30 STUDENTS can
work simultaneously Teaching Unit for the Study of Power Electronics,
including Control Interface. (Converters:DC/AC+AC/DC+
DC/DC+AC/AC) (TECNEL) Computer Control
Software: Computer Control+
Data Acquisition+
Data Management Mini Scada-Net
Software Note:The Mini ESN
system can be used
with any computer
controlled unit OPEN CONTROL
+
MULTICONTROL
+
MULTI STUDENT POST Multipost EDIBON Scada-Net System BASIC ELECTRONICS AND
ELECTRICITY INTEGRATED
LABORATORY
(LIEBA) TEACHING UNIT FOR THE
STUDY OF ANALOG/DIGITAL
AND DIGITAL/ANALOG
CONVERTERS
(CADDA) TEACHING UNIT FOR THE
STUDY OF REGULATION
AND CONTROL
(RYC) TEACHING UNIT FOR THE
STUDY OF POWER
ELECTRONICS
(TECNEL) ELECTRICAL MACHINES
UNIT
(EME) “n”
Any other
additional
unit OPEN CONTROL
+
MULTICONTROL
+
MULTI STUDENT POST “ETDL” EDIBON TECHNICAL
DISTANCE LEARNING SYSTEM 30 students can work
at the same time CENTRAL PLC “REAL TIME MULTICONTROL SYSTEMS” 30 Student
Post
Order information:
Items always included in the supply
Minimum configuration for normal operation includes:
1. Unit: TECNEL. Teaching Unit for the Study of Power Electronics,including Control Interface.
(Converters:DC/AC + AC/DC +DC/DC + AC/AC). 2. DAB.Data Acquisition Board. 3. TECNEL/CCSOF. Computer Control + Data Acquisition + Data Management Software. 4. Cables and Accessories. 5. Manuals.
|
Complementary items to the standard supply
Simulation Software:
6. PECADS. Power Electronics Computer Aided Design and Simulation Software. (Converters: DC/AC, AC/DC, DC/DC, AC/AC).
Measurement Units:
7. EAL. Network Analyzer Unit. 8. EAM-VA. Analog Measurement Unit.
Expansions:
9. Mini ESN. Multipost EDIBON Mini Scada-Net System. 10. ESN. Multipost EDIBON Scada-Net System.
|
* IMPORTANT: Under TECNEL we always supply all the elements for immediate running as 1, 2, 3, 4 and 5.