Notice: Undefined index: en in /var/www/html/redstarvietnam.com/public_html/core/functions/function_global.php on line 0

Warning: Invalid argument supplied for foreach() in /var/www/html/redstarvietnam.com/public_html/core/functions/function_global.php on line 0
ERP-MA - Rơ le quản lý đầu vào
Red Star Vietnam Co., Ltd.
Icons giỏ hàng Cart 0
Total : đ

ERP-MA - Rơ le quản lý đầu vào

State: Out of stock
ERP-MA. Feeders Management Relay Module, for use with the Protection
Relays Test Unit (ERP-UB), to enable investigations into protection and
monitoring of overhead lines, underground cables and feeders.
Modern and robust enclosure (steel box) with carrying handles.
The connections are via safety sockets.
Warranty: No warranty infomation


Price: Contact us




Order
  • Delivery time: 8h00 - 18h00 daily
  • Genuine product, provided width CO, CQ
  • 03 months of free warranty for consumable and accessories
  • 12 months of free warranty for main equipment
  • Accessorie's price is applied only when purchased with
    main equipment
  • Contact us for any particular accessory's quotion
Email: info@redstarvietnam.com Every day in week

Practical possibilities:

 

1.- Verification of the Feeder Management Relay functionality.
2.- Phase Overcurrent Element of the Feeder Management Relay.
3.- Residual Ground Overcurrent Element of the FeederManagementRelay
4.- Overvoltage Element of the Feeder Management Relay
5.- Undervoltage Element of the Feeder Management Relay.
6.- Verification of Phase Instantaneous Overcurrent Protection.
7.- Verification of Phase TimeOvercurrent Protection.
8.- Verification of Residual Overcurrent Element.

9.- Verification of Residual TimeOvercurrent Element.
10.- Verification of Neutral Overcurrent Element.
11.-Verification of Overfrequency Protection Element.
12.- Verification of Underfrequency Protection Element.
13.-Verification of Positive (forward) Power Flow Protection Element.
14.- Verification of Negative (reverse) Power Flow Protection Element.
15.- Protection of Distribution Feeder Example.
16.- Protection of Overhead Transmission Line Example.

The main functions:
+ Four levels of Phase Instantaneous Overcurrent Element (50P).
+ Four levels of Negative-Sequence Overcurrent Element (50Q).
+ Four levels of Residual Overcurrent Element (50G).
+ Four levels of Neutral Overcurrent Element (50G).
+ Two levels of Phase Time-Overcurrent Element (51P).
+ Two levels of Residual Time-Overcurrent Element (51G).
+ Two levels of Ground Time-Overcurrent Element (51G).
+ One level of Negative-Sequence Time-Overcurrent Element (51Q).
+ Phase to Ground Overvoltage (59G).
+ Phase to Phase Overvoltage (59P).
+ Negative-Sequence Overvoltage (59Q).
+ Residual Overvoltage (59G).
+ Phase to Ground Undervoltage (27G).
+ Phase to Phase Undervoltage (27P).
+ Six levels of Secure Overfrequency (81O).
+ Six levels of Secure Underfrequency (81U).
+ Two levels of Negative Power Flow with Definite Time Delay (32).
+ Two levels of Positive Power Flow with Definite Time Delay (32).
+ Station Battery Monitor. Breaker Wear Monitoring.
+ Synchrophasor Protocol. Peak Demand and Demand Metering. AutoReclosing.
+ Creating fault and disturbance records.

The connection to the experimental circuit is via current transformers with ratio to suit the inputs of the relay.

It allows an effective demonstration of the effect of current and voltage transformer ratio, connection and rating on protective relays.

Cables and Accessories, for normal operation.
Manuals: This unit is supplied with 8 manuals.
Dimensions(approx.): 490 x 330 x 310 mm. Weight: 10 Kg.
  • Đánh giá sản phẩm:

(Xem mã khác)

Hiện tại chưa có ý kiến đánh giá nào về sản phẩm. Hãy là người đầu tiên chia sẻ cảm nhận của bạn.